The La Baguette Doree site in Barnsley – before the work begins.
|
 |
 |
The chosen area for the complex is cordoned off, and the ground is prepared by laying concrete plinths. |
 |
 |
The panels for the link to the existing facility are created. |
 |
 |
The coldstores are craned into position, and joined onto the link. |
 |
 |
The walkway panelling arrives for the area between the mega blast defrost combination unit and one of the coldstores. |
 |
Each of the coldstores are modified to suit La Buguette Doree’s requirements. |
 |
Internal work links the complex to the existing facility for both HACCP compliance and efficiency, causing no disruption to the factory. |
 |
The entire complex (with the blast freezer being nearest in shot). |
 |
The four coldstores, which make up the four-bay modular freezer complex. |
 |
The units are finished to a high standard and comply with HACCP. |
 |
The link to the existing facility id handed over. |
 |
The seamless link to the existing facility. |